Bell AI Fabric Saskatchewan
Bell Canada · Sherwood / Regina
- Planned IT
- 300 MW
- Remaining
- 300 MW
- $ / kW·mo
- $69
- White space
- 600k ft²
Inventory
0% occupiedPower
300 MWcampus
300 MW pipeline · 0 MW in use
White space
600k ft²total
600k ft² free · — occupied
56k m² · 56k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$69/kW·mo
8.4¢ industrial · 9.4¢ after PUE 1.12
- Per MW·year
- $824k
- This site · 300 MW
- $247M/yr
- 80 kW rack
- $5,494/mo
2.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $153M/yr less.
SaskPower industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 40%
- Rack density
- 80 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- SaskPower. Dedicated industrial interconnection, RM of Sherwood. Mixed thermal-hydro Prairie grid.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
20k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Sherwood, Saskatchewan, Canada
Rural Municipality of Sherwood, south of Regina, SK
50.401°, -104.618° · North America
Tenants / users
CoreWeave, Cerebras — C$1.7 billion pre-lease
Notes
160-acre, 300 MW purpose-built AI campus. Bell's largest Saskatchewan investment. Bird Construction lead. Fully pre-leased to CoreWeave and Cerebras. SaskPower, not Hydro-Québec. Complements the 500 MW BC book already in the index.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.