Microsoft Thailand
Microsoft Azure · Thailand Cloud Region
- IT live
- 24 MW
- Remaining
- 16 MW
- $ / kW·mo
- $86
- White space
- 179k ft²
Inventory
60% occupiedPower
40 MWcampus
16 MW to commission · 24 MW in use
White space
298k ft²total
119k ft² free · 179k ft² occupied
28k m² · 11k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 26 MW of the utility feed is cooling, conversion, and house load.
Power cost
$86/kW·mo
10.2¢ industrial · 11.8¢ after PUE 1.16
- Per MW·year
- $1M
- This site · 24 MW
- $25M/yr
- 25 kW rack
- $2,159/mo
3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.
EGAT / PEA · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 20%
- Rack density
- 25 kW
- PUE
- 1.161.00 ideal · 1.60 typical
- Power source
- MEA / PEA / EGAT. Dual feeds plus on-site generators.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
0.27 L/kWh
fleet avg · 2025 · 57k m³/yr at 24 MW
Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Bangkok, Bangkok, Thailand
Bangkok metro
13.740°, 100.530° · Asia
Tenants / users
Azure
Notes
Azure Thailand. In-country residency for Bangkok enterprise and public sector.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.