Operational
Hyperscale
Liquid cooling
Tier III

Microsoft Thailand

Microsoft Azure · Thailand Cloud Region

IT live
24 MW
Remaining
16 MW
$ / kW·mo
$86
White space
179k ft²

Inventory

60% occupied

Power

40 MWcampus

16 MW to commission · 24 MW in use

White space

298k ft²total

119k ft² free · 179k ft² occupied

28k m² · 11k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live24 MW
Remaining16 MW
Utility feed50 MW
Campus / planned40 MW

About 26 MW of the utility feed is cooling, conversion, and house load.

Power cost

$86/kW·mo

10.2¢ industrial · 11.8¢ after PUE 1.16

Per MW·year
$1M
This site · 24 MW
$25M/yr
25 kW rack
$2,159/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.

EGAT / PEA · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
20%
Rack density
25 kW
PUE
1.161.00 ideal · 1.60 typical
Power source
MEA / PEA / EGAT. Dual feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 57k m³/yr at 24 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Bangkok, Bangkok, Thailand

Bangkok metro

13.740°, 100.530° · Asia

Tenants / users

Azure

Notes

Azure Thailand. In-country residency for Bangkok enterprise and public sector.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.