Microsoft Azure Mexico Central
Microsoft Azure · Mexico Central
- IT live
- 36 MW
- Remaining
- 44 MW
- $ / kW·mo
- $92
- White space
- 357k ft²
Inventory
45% occupiedPower
80 MWcampus
44 MW to commission · 36 MW in use
White space
794k ft²total
437k ft² free · 357k ft² occupied
74k m² · 41k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 64 MW of the utility feed is cooling, conversion, and house load.
Power cost
$92/kW·mo
9.8¢ industrial · 12.5¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 36 MW
- $40M/yr
- 25 kW rack
- $2,289/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $27M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2024
- Renewable match
- 40%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Queretaro, Queretaro, Mexico
Queretaro
20.592°, -100.392° · North America
Tenants / users
Azure
Notes
Azure Mexico Central, three availability zones. On-site gas reported while CFE high-voltage lands. Not a colo hall.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.