Microsoft Azure Mexico Central

Microsoft Azure · Mexico Central

IT live
36 MW
Remaining
44 MW
$ / kW·mo
$92
White space
357k ft²

Inventory

45% occupied

Power

80 MWcampus

44 MW to commission · 36 MW in use

White space

794k ft²total

437k ft² free · 357k ft² occupied

74k m² · 41k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining44 MW
Utility feed100 MW
Campus / planned80 MW

About 64 MW of the utility feed is cooling, conversion, and house load.

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 36 MW
$40M/yr
25 kW rack
$2,289/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $27M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2024
Renewable match
40%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.592°, -100.392° · North America

Tenants / users

Azure

Notes

Azure Mexico Central, three availability zones. On-site gas reported while CFE high-voltage lands. Not a colo hall.