Operational
Hyperscale
Liquid cooling
Tier III

Microsoft Korea South Busan

Microsoft Azure · Busan Cloud Region

IT live
20 MW
Remaining
12 MW
$ / kW·mo
$88
White space
83k ft²

Inventory

63% occupied

Power

32 MWcampus

12 MW to commission · 20 MW in use

White space

133k ft²total

50k ft² free · 83k ft² occupied

12k m² · 4,645 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live20 MW
Remaining12 MW
Utility feed40 MW
Campus / planned32 MW

About 20 MW of the utility feed is cooling, conversion, and house load.

Power cost

$88/kW·mo

10.4¢ industrial · 12.1¢ after PUE 1.16

Per MW·year
$1.1M
This site · 20 MW
$21M/yr
20 kW rack
$1,761/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

KEPCO · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2017
Renewable match
40%
Rack density
20 kW
PUE
1.161.00 ideal · 1.60 typical
Power source
KEPCO. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 47k m³/yr at 20 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Busan, Busan, South Korea

Busan metro

35.180°, 129.075° · Asia

Tenants / users

Azure

Notes

Azure Korea South. Geo-pair to Seoul.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.