Operational
Hyperscale
Liquid cooling
Tier III

Microsoft South Africa North

Microsoft Azure · Johannesburg Cloud Region

IT live
36 MW
Remaining
19 MW
$ / kW·mo
$81
White space
129k ft²

Inventory

65% occupied

Power

55 MWcampus

19 MW to commission · 36 MW in use

White space

196k ft²total

68k ft² free · 129k ft² occupied

18k m² · 6,304 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining19 MW
Utility feed68.8 MW
Campus / planned55 MW

About 32.8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$81/kW·mo

9.4¢ industrial · 11.1¢ after PUE 1.18

Per MW·year
$972k
This site · 36 MW
$35M/yr
25 kW rack
$2,024/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $23M/yr less.

Eskom Gauteng · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
60%
Rack density
25 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 85k m³/yr at 36 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Johannesburg, Gauteng, South Africa

Johannesburg metro

-26.050°, 28.100° · Africa

Tenants / users

Azure

Notes

Azure South Africa North. Pair region with Cape Town.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.