Operational
Hyperscale
Liquid cooling
Tier III

Microsoft Japan West

Microsoft Azure · Osaka

IT live
40 MW
Remaining
20 MW
$ / kW·mo
$140
White space
125k ft²

Inventory

67% occupied

Power

60 MWcampus

20 MW to commission · 40 MW in use

White space

188k ft²total

63k ft² free · 125k ft² occupied

17k m² · 5,806 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live40 MW
Remaining20 MW
Utility feed75 MW
Campus / planned60 MW

About 35 MW of the utility feed is cooling, conversion, and house load.

Power cost

$140/kW·mo

16.2¢ industrial · 19.1¢ after PUE 1.18

Per MW·year
$1.7M
This site · 40 MW
$67M/yr
30 kW rack
$4,186/mo
3.2¢ cheapdear 22.4¢

5.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.

Kansai Electric · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2014
Renewable match
75%
Rack density
30 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Kansai Electric (KEPCO). Dual feeds. Seismically isolated building.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 95k m³/yr at 40 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Osaka, Osaka, Japan

Japan West AZs, Osaka

34.700°, 135.500° · Asia

Tenants / users

Azure, DR for Japan East

Notes

Microsoft's Kansai region. Pair of Japan East for residency and DR.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.