Operational
Hyperscale
Liquid cooling
Tier III

Microsoft Indonesia Central Jakarta

Microsoft Azure · Jakarta Cloud Region

IT live
28 MW
Remaining
22 MW
$ / kW·mo
$78
White space
223k ft²

Inventory

56% occupied

Power

50 MWcampus

22 MW to commission · 28 MW in use

White space

399k ft²total

175k ft² free · 223k ft² occupied

37k m² · 16k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live28 MW
Remaining22 MW
Utility feed62.5 MW
Campus / planned50 MW

About 34.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$78/kW·mo

9.2¢ industrial · 10.7¢ after PUE 1.16

Per MW·year
$935k
This site · 28 MW
$26M/yr
25 kW rack
$1,948/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.

PLN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
20%
Rack density
25 kW
PUE
1.161.00 ideal · 1.60 typical
Power source
PLN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 66k m³/yr at 28 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Jakarta, Jakarta, Indonesia

Jakarta metro

-6.210°, 106.850° · Asia

Tenants / users

Azure

Notes

Azure Indonesia Central. Complements the Singapore region for in-country data residency.

Operator site