Operational
Hyperscale
Liquid cooling
Tier III

Microsoft South Africa West

Microsoft Azure · Cape Town Cloud Region

IT live
24 MW
Remaining
16 MW
$ / kW·mo
$88
White space
100k ft²

Inventory

60% occupied

Power

40 MWcampus

16 MW to commission · 24 MW in use

White space

167k ft²total

67k ft² free · 100k ft² occupied

15k m² · 6,194 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live24 MW
Remaining16 MW
Utility feed50 MW
Campus / planned40 MW

About 26 MW of the utility feed is cooling, conversion, and house load.

Power cost

$88/kW·mo

10.2¢ industrial · 12¢ after PUE 1.18

Per MW·year
$1.1M
This site · 24 MW
$25M/yr
20 kW rack
$1,757/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.

Eskom / City of Cape Town · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
60%
Rack density
20 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

0.27 L/kWh

fleet avg · 2025 · 57k m³/yr at 24 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Microsoft FY2025 water intensity disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cape Town, Western Cape, South Africa

Cape Town metro

-33.900°, 18.600° · Africa

Tenants / users

Azure

Notes

Azure South Africa West. Geo-pair to Johannesburg.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.