Operational
Hyperscale
Liquid cooling
Tier III

Microsoft Azure 21Vianet Shanghai

21Vianet Azure · Shanghai Cloud Region

IT live
32 MW
Remaining
16 MW
$ / kW·mo
$85
White space
133k ft²

Inventory

67% occupied

Power

48 MWcampus

16 MW to commission · 32 MW in use

White space

200k ft²total

67k ft² free · 133k ft² occupied

19k m² · 6,194 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live32 MW
Remaining16 MW
Utility feed60 MW
Campus / planned48 MW

About 28 MW of the utility feed is cooling, conversion, and house load.

Power cost

$85/kW·mo

9.7¢ industrial · 11.6¢ after PUE 1.20

Per MW·year
$1M
This site · 32 MW
$33M/yr
20 kW rack
$1,699/mo
3.2¢ cheapdear 22.4¢

3.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.

Shanghai industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
40%
Rack density
20 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Shanghai, Shanghai, China

Shanghai metro (operated by 21Vianet)

31.250°, 121.500° · Asia

Tenants / users

Azure (China)

Notes

Azure China East. 21Vianet operated.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.