Operational
Hyperscale
Liquid cooling
Tier III

Microsoft Azure 21Vianet Beijing

21Vianet Azure · Beijing Cloud Region

IT live
36 MW
Remaining
14 MW
$ / kW·mo
$97
White space
150k ft²

Inventory

72% occupied

Power

50 MWcampus

14 MW to commission · 36 MW in use

White space

208k ft²total

58k ft² free · 150k ft² occupied

19k m² · 5,419 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining14 MW
Utility feed62.5 MW
Campus / planned50 MW

About 26.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$97/kW·mo

11.1¢ industrial · 13.3¢ after PUE 1.20

Per MW·year
$1.2M
This site · 36 MW
$42M/yr
20 kW rack
$1,945/mo
3.2¢ cheapdear 22.4¢

3.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $30M/yr less.

Beijing industrial 35 kV+ · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
40%
Rack density
20 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
State Grid / China Southern Grid. Dual municipal feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Beijing, Beijing, China

Beijing metro (operated by 21Vianet)

39.920°, 116.450° · Asia

Tenants / users

Azure (China)

Notes

Azure China operated by 21Vianet. Independent from global Azure.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.