AWS Taipei
Amazon Web Services · Taipei
- IT live
- 20 MW
- Remaining
- 20 MW
- $ / kW·mo
- $78
- White space
- 71k ft²
Inventory
50% occupiedPower
40 MWcampus
20 MW to commission · 20 MW in use
White space
143k ft²total
71k ft² free · 71k ft² occupied
13k m² · 6,636 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 30 MW of the utility feed is cooling, conversion, and house load.
Power cost
$78/kW·mo
9.2¢ industrial · 10.7¢ after PUE 1.16
- Per MW·year
- $935k
- This site · 20 MW
- $19M/yr
- 25 kW rack
- $1,948/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.
Taipower · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 25%
- Rack density
- 25 kW
- PUE
- 1.161.00 ideal · 1.60 typical
- Power source
- Taipower. Dual feeds. Seismic design.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
0.12 L/kWh
fleet avg · 2025 · 21k m³/yr at 20 MW
Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Taipei, Taipei, Taiwan
Taipei metro
25.020°, 121.480° · Asia
Tenants / users
AWS customers
Notes
AWS Taipei infrastructure (Local Zone / regional build-out). Complements Google Changhua and Azure Taiwan North.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.