Operational
Hyperscale
Liquid cooling
Tier III

AWS Taipei

Amazon Web Services · Taipei

IT live
20 MW
Remaining
20 MW
$ / kW·mo
$78
White space
71k ft²

Inventory

50% occupied

Power

40 MWcampus

20 MW to commission · 20 MW in use

White space

143k ft²total

71k ft² free · 71k ft² occupied

13k m² · 6,636 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live20 MW
Remaining20 MW
Utility feed50 MW
Campus / planned40 MW

About 30 MW of the utility feed is cooling, conversion, and house load.

Power cost

$78/kW·mo

9.2¢ industrial · 10.7¢ after PUE 1.16

Per MW·year
$935k
This site · 20 MW
$19M/yr
25 kW rack
$1,948/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

Taipower · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2025
Renewable match
25%
Rack density
25 kW
Voltage
PUE
1.161.00 ideal · 1.60 typical
Power source
Taipower. Dual feeds. Seismic design.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.12 L/kWh

fleet avg · 2025 · 21k m³/yr at 20 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Taipei, Taipei, Taiwan

Taipei metro

25.020°, 121.480° · Asia

Tenants / users

AWS customers

Notes

AWS Taipei infrastructure (Local Zone / regional build-out). Complements Google Changhua and Azure Taiwan North.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.