Operational
Hyperscale
Liquid cooling
Tier III

AWS Asia Pacific Sydney

Amazon Web Services · ap-southeast-2

IT live
300 MW
Remaining
0 MW
$ / kW·mo
$119
White space
1.3M ft²

Inventory

100% occupied

Power

300 MWcampus

0 MW to commission · 300 MW in use

White space

1.3M ft²total

free · 1.3M ft² occupied

116k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live300 MW
Remaining0 MW
Utility feed375 MW
Campus / planned300 MW

About 75 MW of the utility feed is cooling, conversion, and house load.

Power cost

$119/kW·mo

14.2¢ industrial · 16.3¢ after PUE 1.15

Per MW·year
$1.4M
This site · 300 MW
$429M/yr
20 kW rack
$2,384/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $332M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2012
Renewable match
80%
Rack density
20 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Ausgrid / Endeavour. 430 MW of new renewables contracted April 2026.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

0.12 L/kWh

fleet avg · 2025 · 315k m³/yr at 300 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Multiple AZs. Older halls evaporative; Trainium/AI halls liquid-ready.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sydney, New South Wales, Australia

Greater Sydney, NSW

-33.860°, 151.040° · Oceania

Tenants / users

AWS customers

Notes

ap-southeast-2. Largest AWS region in Oceania, ~300 MW tracked.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.