AWS South America Santiago
Amazon Web Services · Chile
- Planned IT
- 100 MW
- Remaining
- 100 MW
- $ / kW·mo
- $76
- White space
- 357k ft²
Inventory
0% occupiedPower
100 MWcampus
100 MW pipeline · 0 MW in use
White space
357k ft²total
357k ft² free · — occupied
33k m² · 33k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$76/kW·mo
9¢ industrial · 10.3¢ after PUE 1.15
- Per MW·year
- $907k
- This site · 100 MW
- $91M/yr
- 25 kW rack
- $1,889/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $58M/yr less.
Chile SING/SIC · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 90%
- Rack density
- 25 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Chilean grid. Third AWS LatAm region after Brazil (2011) and Mexico (2025).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
0.12 L/kWh
fleet avg · 2025 · 105k m³/yr at 100 MW
Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.
New region, liquid-ready AZs.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Huechuraba, Santiago Metropolitan, Chile
Huechuraba, Santiago
-33.374°, -70.637° · South America
Tenants / users
AWS customers
Notes
AWS Santiago region activating 2026. 100–150 MW utility class.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.