AWS Europe (Paris)
Amazon Web Services · eu-west-3
- IT live
- 80 MW
- Remaining
- 40 MW
- $ / kW·mo
- $87
- White space
- 625k ft²
Inventory
67% occupiedPower
120 MWcampus
40 MW to commission · 80 MW in use
White space
938k ft²total
313k ft² free · 625k ft² occupied
87k m² · 29k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 70 MW of the utility feed is cooling, conversion, and house load.
Power cost
$87/kW·mo
10.4¢ industrial · 11.9¢ after PUE 1.14
- Per MW·year
- $1M
- This site · 80 MW
- $83M/yr
- 20 kW rack
- $1,731/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $58M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2017
- Renewable match
- 95%
- Rack density
- 20 kW
- PUE
- 1.141.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
0.12 L/kWh
fleet avg · 2025 · 84k m³/yr at 80 MW
Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Paris, Île-de-France, France
Greater Paris (AZ undisclosed)
48.860°, 2.320° · Europe
Tenants / users
AWS
Notes
eu-west-3. First AWS French region. Three AZs. Completes the Paris cloud set with Azure France Central and Google europe-west9.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.