AWS Mexico (Queretaro)
Amazon Web Services · Mexico
- IT live
- 24 MW
- Remaining
- 36 MW
- $ / kW·mo
- $92
- White space
- 268k ft²
Inventory
40% occupiedPower
60 MWcampus
36 MW to commission · 24 MW in use
White space
670k ft²total
402k ft² free · 268k ft² occupied
62k m² · 37k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 51 MW of the utility feed is cooling, conversion, and house load.
Power cost
$92/kW·mo
9.8¢ industrial · 12.5¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 24 MW
- $26M/yr
- 25 kW rack
- $2,289/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $18M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2025
- Renewable match
- 40%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Queretaro, Queretaro, Mexico
Queretaro
20.586°, -100.386° · North America
Tenants / users
AWS
Notes
AWS Mexico region / Local Zone. CFE Finsa substation energized 2026 for early MW. Three AZs planned.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.