Expanding
Hyperscale
Liquid cooling
Tier III

AWS Mexico (Queretaro)

Amazon Web Services · Mexico

IT live
24 MW
Remaining
36 MW
$ / kW·mo
$92
White space
268k ft²

Inventory

40% occupied

Power

60 MWcampus

36 MW to commission · 24 MW in use

White space

670k ft²total

402k ft² free · 268k ft² occupied

62k m² · 37k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live24 MW
Remaining36 MW
Utility feed75 MW
Campus / planned60 MW

About 51 MW of the utility feed is cooling, conversion, and house load.

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 24 MW
$26M/yr
25 kW rack
$2,289/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $18M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2025
Renewable match
40%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.586°, -100.386° · North America

Tenants / users

AWS

Notes

AWS Mexico region / Local Zone. CFE Finsa substation energized 2026 for early MW. Three AZs planned.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.