Operational
Hyperscale
Liquid cooling
Tier III

AWS Asia Pacific Jakarta

Amazon Web Services · Jakarta Cloud Region

IT live
36 MW
Remaining
24 MW
$ / kW·mo
$78
White space
268k ft²

Inventory

60% occupied

Power

60 MWcampus

24 MW to commission · 36 MW in use

White space

446k ft²total

179k ft² free · 268k ft² occupied

41k m² · 17k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining24 MW
Utility feed75 MW
Campus / planned60 MW

About 39 MW of the utility feed is cooling, conversion, and house load.

Power cost

$78/kW·mo

9.2¢ industrial · 10.7¢ after PUE 1.16

Per MW·year
$935k
This site · 36 MW
$34M/yr
25 kW rack
$1,948/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.

PLN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
20%
Rack density
25 kW
PUE
1.161.00 ideal · 1.60 typical
Power source
PLN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.12 L/kWh

fleet avg · 2025 · 38k m³/yr at 36 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Jakarta, Jakarta, Indonesia

Jakarta metro (ap-southeast-3, AZ undisclosed)

-6.200°, 106.840° · Asia

Tenants / users

AWS customers

Notes

ap-southeast-3. Three AZs. First AWS region in Indonesia.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.