Planned
Hyperscale
Air cooled

AWS Falls Township

Amazon Web Services · Bucks County

Planned IT
—
Remaining
—
$ / kW·mo
$70
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$70/kW·mo

7.4¢ industrial · 9.6¢ after PUE —

Per MW·year
$843k
This site
—
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun).

Duquesne / PJM · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

0.12 L/kWh

fleet avg · 2025

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Falls Township, Pennsylvania, United States

40.174°, -74.792° · North America

Tenants / users

Amazon

Notes

One of the first two sites of Amazon's at least USD 20B Pennsylvania data center plan (with Salem Township), Bucks County (Amazon / PA DCED, Jun 2025). Typed planned; construction stage not verified. Coordinates: OSM relation 3506331 (town center, approximate). Sources: https://www.aboutamazon.com/news/aws/amazon-pennsylvania-investment-cloud-infrastructure-ai-innovation ; https://dced.pa.gov/newsroom/governor-josh-shapiro-announces-amazon-plans-to-invest-20-billion-in-pennsylvania-for-ai-infrastructure-in-largest-capital-investment-in-commonwealth-history/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.