AWS Europe Ireland
Amazon Web Services · Dublin
- IT live
- 150 MW
- Remaining
- 50 MW
- $ / kW·mo
- $150
- White space
- 750k ft²
Inventory
75% occupiedPower
200 MWcampus
50 MW to commission · 150 MW in use
White space
1M ft²total
250k ft² free · 750k ft² occupied
93k m² · 23k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 50 MW of the utility feed is cooling, conversion, and house load.
Power cost
$150/kW·mo
17.4¢ industrial · 20.5¢ after PUE 1.18
- Per MW·year
- $1.8M
- This site · 150 MW
- $270M/yr
- 15 kW rack
- $2,248/mo
5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $220M/yr less.
Ireland industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2007
- Renewable match
- 70%
- Rack density
- 15 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- EirGrid plus wind PPAs.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
15 kW
H100-eq
—
WUE
0.12 L/kWh
fleet avg · 2025 · 158k m³/yr at 150 MW
Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.
Free-air economization. First AWS region outside the United States.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Dublin, Leinster, Ireland
Dublin region (multiple AZs)
53.349°, -6.260° · Europe
Tenants / users
AWS customers
Notes
eu-west-1. Ireland's grid constraints have slowed new permits since 2022.