Operational
Hyperscale
Air cooled
Tier III

AWS Europe Ireland

Amazon Web Services · Dublin

IT live
150 MW
Remaining
50 MW
$ / kW·mo
$150
White space
750k ft²

Inventory

75% occupied

Power

200 MWcampus

50 MW to commission · 150 MW in use

White space

1M ft²total

250k ft² free · 750k ft² occupied

93k m² · 23k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live150 MW
Remaining50 MW
Utility feed200 MW
Campus / planned200 MW

About 50 MW of the utility feed is cooling, conversion, and house load.

Power cost

$150/kW·mo

17.4¢ industrial · 20.5¢ after PUE 1.18

Per MW·year
$1.8M
This site · 150 MW
$270M/yr
15 kW rack
$2,248/mo
3.2¢ cheapdear 22.4¢

5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $220M/yr less.

Ireland industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2007
Renewable match
70%
Rack density
15 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
EirGrid plus wind PPAs.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

15 kW

H100-eq

WUE

0.12 L/kWh

fleet avg · 2025 · 158k m³/yr at 150 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Free-air economization. First AWS region outside the United States.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Dublin, Leinster, Ireland

Dublin region (multiple AZs)

53.349°, -6.260° · Europe

Tenants / users

AWS customers

Notes

eu-west-1. Ireland's grid constraints have slowed new permits since 2022.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.