Planned
Hyperscale
Air cooled

AWS Douglas County

Amazon Web Services · Douglas County

Planned IT
—
Remaining
—
$ / kW·mo
$66
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$66/kW·mo

7¢ industrial · 9.1¢ after PUE —

Per MW·year
$797k
This site
—
3.2¢ cheapdear 22.4¢

2.2× the cheapest market (Iceland Landsvirkjun).

Georgia Power · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

0.12 L/kWh

fleet avg · 2025

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Douglas County, Georgia, United States

33.700°, -84.762° · North America

Tenants / users

Amazon

Notes

Part of AWS's estimated USD 11B Georgia plan covering Butts and Douglas counties, at least 550 jobs (Amazon, Jan 2025). Typed planned; construction stage not verified. Coordinates: OSM relation 1059843 (county center, approximate) (same county center as Google Douglas County; separate operator). Source: https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.