Planned
Hyperscale
Air cooled

AWS Clinton

Amazon Web Services · Hinds County

Planned IT
—
Remaining
—
$ / kW·mo
$76
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$76/kW·mo

8¢ industrial · 10.4¢ after PUE —

Per MW·year
$911k
This site
—
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun).

US industrial · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

0.12 L/kWh

fleet avg · 2025

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Air-cooled chillers in a retrofitted building (Amazon to Mississippi Today, Jun 2026).

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Clinton, Mississippi, United States

32.341°, -90.322° · North America

Tenants / users

Amazon

Notes

In site prep / pre-construction; retrofitted building (Amazon to Mississippi Today, Jun 2026). Coordinates: OSM relation 13650977 (town center, approximate). Source: https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.