Operational
Hyperscale
Liquid cooling
Tier III

AWS Africa Cape Town

Amazon Web Services · Cape Town Cloud Region

IT live
40 MW
Remaining
30 MW
$ / kW·mo
$88
White space
167k ft²

Inventory

57% occupied

Power

70 MWcampus

30 MW to commission · 40 MW in use

White space

292k ft²total

125k ft² free · 167k ft² occupied

27k m² · 12k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live40 MW
Remaining30 MW
Utility feed87.5 MW
Campus / planned70 MW

About 47.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$88/kW·mo

10.2¢ industrial · 12¢ after PUE 1.18

Per MW·year
$1.1M
This site · 40 MW
$42M/yr
20 kW rack
$1,757/mo
3.2¢ cheapdear 22.4¢

3.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $29M/yr less.

Eskom / City of Cape Town · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
50%
Rack density
20 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

0.12 L/kWh

fleet avg · 2025 · 42k m³/yr at 40 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Evaporative baseline; liquid-ready AI halls. Three-AZ region.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cape Town, Western Cape, South Africa

Cape Town metro (af-south-1)

-33.910°, 18.550° · Africa

Tenants / users

AWS customers

Notes

AWS's only African region (af-south-1). Three AZs in the Cape Town metro.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.