AWS Canton
Amazon Web Services · Madison County
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $76
- White space
- —
Power
Power cost
$76/kW·mo
8¢ industrial · 10.4¢ after PUE —
- Per MW·year
- $911k
- This site
- —
2.5× the cheapest market (Iceland Landsvirkjun).
US industrial · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Hybrid
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
0.12 L/kWh
fleet avg · 2025
Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.
Amazon (via Mississippi Today, Jun 2026): water used for cooling only in the hottest ~9% of the year, air cooling the rest. Typed hybrid.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Canton, Mississippi, United States
32.613°, -90.037° · North America
Tenants / users
Amazon
Notes
Five buildings operational with plans to at least double (Amazon to Mississippi Today, Jun 2026). Announced Jan 2024 as part of a USD 10B plan for two Madison County complexes; Amazon now plans about USD 25B across four Mississippi sites. Cooling water from Canton Municipal Utilities, moving to recycled wastewater with Veolia. Coordinates: OSM relation 8322809 (town center, approximate). Sources: https://www.aboutamazon.com/news/aws/aws-10-billion-investment-mississippi ; https://mississippitoday.org/2026/06/09/amazon-data-centers-mississippi/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.