AWS Canada West (Calgary)

Amazon Web Services · ca-west-1

IT live
48 MW
Remaining
32 MW
$ / kW·mo
$60
White space
417k ft²

Inventory

60% occupied

Power

80 MWcampus

32 MW to commission · 48 MW in use

White space

694k ft²total

278k ft² free · 417k ft² occupied

65k m² · 26k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live48 MW
Remaining32 MW
Utility feed100 MW
Campus / planned80 MW

About 52 MW of the utility feed is cooling, conversion, and house load.

Power cost

$60/kW·mo

7.2¢ industrial · 8.3¢ after PUE 1.15

Per MW·year
$725k
This site · 48 MW
$35M/yr
20 kW rack
$1,209/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $19M/yr less.

Alberta AESO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
40%
Rack density
20 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
ENMAX / AESO. Dual feeds plus on-site diesel. Gas-marginal Alberta grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

—

WUE

0.12 L/kWh

fleet avg · 2025 · 50k m³/yr at 48 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Calgary, Alberta, Canada

Greater Calgary (AZ undisclosed)

51.050°, -114.070° · North America

Tenants / users

AWS

Notes

ca-west-1. Second AWS Canadian region. Prairie dual-site to Montréal. AESO gas-marginal — not the Hydro-Québec story.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.