Operational
Hyperscale
Liquid cooling
Tier III

AWS Europe Spain Aragón

Amazon Web Services · Aragón

IT live
80 MW
Remaining
40 MW
$ / kW·mo
$102
White space
286k ft²

Inventory

67% occupied

Power

120 MWcampus

40 MW to commission · 80 MW in use

White space

429k ft²total

143k ft² free · 286k ft² occupied

40k m² · 13k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live80 MW
Remaining40 MW
Utility feed150 MW
Campus / planned120 MW

About 70 MW of the utility feed is cooling, conversion, and house load.

Power cost

$102/kW·mo

12.2¢ industrial · 14¢ after PUE 1.15

Per MW·year
$1.2M
This site · 80 MW
$98M/yr
25 kW rack
$2,560/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $73M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
100%
Rack density
25 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Aragón wind. Three-AZ region (eu-south-2).

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

0.12 L/kWh

fleet avg · 2025 · 84k m³/yr at 80 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. AWS 2025 sustainability disclosure.

Evaporative baseline; newer AI halls liquid-ready.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Villanueva de Gállego, Aragón, Spain

Villanueva de Gállego / El Burgo de Ebro / Huesca

41.769°, -0.824° · Europe

Tenants / users

AWS customers

Notes

AWS Spain region — Villanueva, El Burgo and Huesca AZs. Hydro and wind heavy.

Operator site