Planned
Colocation
Liquid cooling
Tier III

atNorth NOR01 Haugaland

atNorth · NOR01

Planned IT
350 MW
Free to lease
350 MW
$ / kW·mo
$36
White space
875k ft²

Inventory

0% occupied

Power

350 MWlive

350 MW to lease · 0 MW in use

White space

875k ft²total

875k ft² free · occupied

81k m² · 81k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease350 MW
Utility feed
Campus / planned350 MW

Power cost

$36/kW·mo

4.4¢ industrial · 4.9¢ after PUE 1.12

Per MW·year
$432k
This site · 350 MW
$151M/yr
40 kW rack
$1,439/mo
3.2¢ cheapdear 22.4¢

1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $41M/yr less.

Norway NO2 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
100%
Rack density
40 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Statnett / Fagne. Dedicated substations under construction.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Haugesund, Rogaland, Norway

Haugaland, Rogaland

59.414°, 5.268° · Europe

Tenants / users

HPC, AI colo, hyperscale

Notes

atNorth's first Norway mega site. 120 MW first power, 350 MW campus. Completes atNorth across all five Nordic countries. Power delivery targeted 2028.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.