atNorth NOR01 Haugaland
atNorth · NOR01
- Planned IT
- 350 MW
- Free to lease
- 350 MW
- $ / kW·mo
- $36
- White space
- 875k ft²
Inventory
0% occupiedPower
350 MWlive
350 MW to lease · 0 MW in use
White space
875k ft²total
875k ft² free · — occupied
81k m² · 81k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$36/kW·mo
4.4¢ industrial · 4.9¢ after PUE 1.12
- Per MW·year
- $432k
- This site · 350 MW
- $151M/yr
- 40 kW rack
- $1,439/mo
1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $41M/yr less.
Norway NO2 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 40 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Statnett / Fagne. Dedicated substations under construction.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Haugesund, Rogaland, Norway
Haugaland, Rogaland
59.414°, 5.268° · Europe
Tenants / users
HPC, AI colo, hyperscale
Notes
atNorth's first Norway mega site. 120 MW first power, 350 MW campus. Completes atNorth across all five Nordic countries. Power delivery targeted 2028.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.