Expanding
Colocation
Liquid cooling
Tier III

atNorth ICE02 Mjolnir

atNorth · Reykjanes

atNorth ICE02 Mjolnir facility
atNorth · Source
IT live
80 MW
Free to lease
14.1 MW
$ / kW·mo
$26
White space
160k ft²

Inventory

82% occupied

Power

80 MWlive

14.1 MW to lease · 65.9 MW in use

White space

160k ft²total

28k ft² free · 132k ft² occupied

15k m² · 2,620 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live80 MW
Free to lease14.1 MW
Utility feed104 MW
Campus / planned83 MW

About 23.8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$26/kW·mo

3.2¢ industrial · 3.6¢ after PUE 1.12

Per MW·year
$314k
This site · 80 MW
$25M/yr
80 kW rack
$2,093/mo
3.2¢ cheapdear 22.4¢

cheapest in the index (Iceland Landsvirkjun).

Iceland Landsvirkjun · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
100%
Rack density
80 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Landsvirkjun. Next to Keflavík International Airport.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Dry coolers plus free-air plus direct-to-chip. 40 kW air / 100 kW DLC. Crusoe 33 MW original + 24 MW GB200 expansion.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Reykjanesbær, Southern Peninsula, Iceland

Sjonarholl 6, 260 Reykjanesbær

63.998°, -22.558° · Europe

Tenants / users

Crusoe, HPC, AI clouds

Notes

13,750 m², 80 MW live, 83 MW build-out. atNorth acquired 2026 in a US$4bn take-out. Nvidia GB200 NVL72 on site.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.