atNorth ICE02 Mjolnir
atNorth · Reykjanes

- IT live
- 80 MW
- Free to lease
- 14.1 MW
- $ / kW·mo
- $26
- White space
- 160k ft²
Inventory
82% occupiedPower
80 MWlive
14.1 MW to lease · 65.9 MW in use
White space
160k ft²total
28k ft² free · 132k ft² occupied
15k m² · 2,620 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 23.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$26/kW·mo
3.2¢ industrial · 3.6¢ after PUE 1.12
- Per MW·year
- $314k
- This site · 80 MW
- $25M/yr
- 80 kW rack
- $2,093/mo
cheapest in the index (Iceland Landsvirkjun).
Iceland Landsvirkjun · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 100%
- Rack density
- 80 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Landsvirkjun. Next to Keflavík International Airport.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Dry coolers plus free-air plus direct-to-chip. 40 kW air / 100 kW DLC. Crusoe 33 MW original + 24 MW GB200 expansion.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Reykjanesbær, Southern Peninsula, Iceland
Sjonarholl 6, 260 Reykjanesbær
63.998°, -22.558° · Europe
Tenants / users
Crusoe, HPC, AI clouds
Notes
13,750 m², 80 MW live, 83 MW build-out. atNorth acquired 2026 in a US$4bn take-out. Nvidia GB200 NVL72 on site.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.