atNorth FIN04 Kouvola
atNorth · FIN04 Myllykoski
- Planned IT
- 120 MW
- Free to lease
- 120 MW
- $ / kW·mo
- $47
- White space
- 333k ft²
Inventory
0% occupiedPower
120 MWlive
120 MW to lease · 0 MW in use
White space
333k ft²total
333k ft² free · — occupied
31k m² · 31k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$47/kW·mo
5.8¢ industrial · 6.5¢ after PUE 1.12
- Per MW·year
- $569k
- This site · 120 MW
- $68M/yr
- 35 kW rack
- $1,660/mo
1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $31M/yr less.
Finland Hamina / Kymenlaakso · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 100%
- Rack density
- 35 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Fingrid. Dual feeds. Nuclear (Olkiluoto 3) plus hydro and wind.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
35 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kouvola, Kymenlaakso, Finland
Myllykoski, Kouvola
60.771°, 26.784° · Europe
Tenants / users
HPC, AI colo, hyperscale
Notes
atNorth Finland mega site. Same Kymenlaakso corridor as Google Hamina. Wind plus nuclear Finnish mix.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.