Expanding
Colocation
Liquid cooling
Tier III

atNorth FIN02 Espoo

atNorth · FIN02

IT live
12 MW
Free to lease
1.4 MW
$ / kW·mo
$62
White space
134k ft²

Inventory

88% occupied

Power

12 MWlive

1.4 MW to lease · 10.6 MW in use

White space

134k ft²total

6,429 ft² free · 128k ft² occupied

12k m² · 597 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease1.4 MW
Utility feed30 MW
Campus / planned24 MW

About 18 MW of the utility feed is cooling, conversion, and house load.

Power cost

$62/kW·mo

7.2¢ industrial · 8.5¢ after PUE 1.18

Per MW·year
$744k
This site · 12 MW
$8.9M/yr
18 kW rack
$1,116/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5M/yr less.

Finland south · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2025
Renewable match
100%
Rack density
18 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Fingrid. Dual feeds. Nuclear (Olkiluoto 3) plus hydro and wind.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

18 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Espoo, Uusimaa, Finland

Sinimäentie, Espoo

60.207°, 24.656° · Europe

Tenants / users

HPC, cloud, enterprise

Notes

Espoo campus next to Equinix HE6/HE7 on Sinimäki. 23,000 sqm full build. First phase white space ~2,200 sqm.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.