Under construction
Colocation
Liquid cooling
Tier III

atNorth DEN02 Varde

atNorth · DEN02

Planned IT
80 MW
Free to lease
80 MW
$ / kW·mo
$94
White space
250k ft²

Inventory

0% occupied

Power

80 MWlive

80 MW to lease · 0 MW in use

White space

250k ft²total

250k ft² free · occupied

23k m² · 23k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease80 MW
Utility feed
Campus / planned80 MW

Power cost

$94/kW·mo

11.2¢ industrial · 12.9¢ after PUE 1.15

Per MW·year
$1.1M
This site · 80 MW
$90M/yr
30 kW rack
$2,821/mo
3.2¢ cheapdear 22.4¢

3.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $64M/yr less.

Denmark DK1 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
100%
Rack density
30 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Energinet. Dual feeds. Wind-heavy Danish grid plus Viking Link.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Varde, South Denmark, Denmark

Varde, West Jutland

55.621°, 8.481° · Europe

Tenants / users

Hyperscale, AI colo

Notes

Jutland mega site. Next to the Microsoft Esbjerg/Varde land. Wind-corridor DK1. Complements DEN01 Ballerup.

Operator site