AtlasEdge Amsterdam
AtlasEdge · Amsterdam
- IT live
- 6 MW
- Free to lease
- 0.5 MW
- $ / kW·mo
- $146
- White space
- 69k ft²
Inventory
91% occupiedPower
6 MWlive
0.5 MW to lease · 5.5 MW in use
White space
69k ft²total
3,750 ft² free · 66k ft² occupied
6,452 m² · 348 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 4 MW of the utility feed is cooling, conversion, and house load.
Power cost
$146/kW·mo
15.6¢ industrial · 20¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 6 MW
- $10M/yr
- 8 kW rack
- $1,166/mo
4.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.3M/yr less.
Amsterdam metro / Liander 50 kV · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2015
- Renewable match
- 100%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Indirect free-air / IDEC most of the year. Closed-loop dry coolers; no evaporative towers on interconnection halls.
Network carriers
11On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Amsterdam, North Holland, Netherlands
Amsterdam metro
52.338°, 4.920° · Europe
Tenants / users
Enterprise, edge, content, networks
Notes
Liberty Global / DigitalBridge edge platform. Complements Global Switch Huizingalaan for west-Amsterdam colo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.