Operational
Colocation
Air cooled
Tier III

Asterion Covilhã

Asterion · Covilhã

IT live
7 MW
Free to lease
1.1 MW
$ / kW·mo
$106
White space
49k ft²

Inventory

84% occupied

Power

7 MWlive

1.1 MW to lease · 5.9 MW in use

White space

49k ft²total

7,778 ft² free · 41k ft² occupied

4,516 m² · 723 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live7 MW
Free to lease1.1 MW
Utility feed8.8 MW
Campus / planned7 MW

About 1.8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$106/kW·mo

11.6¢ industrial · 14.5¢ after PUE 1.25

Per MW·year
$1.3M
This site · 7 MW
$8.9M/yr
8 kW rack
$847/mo
3.2¢ cheapdear 22.4¢

3.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.4M/yr less.

Portugal industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
80%
Rack density
8 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
Interior Portugal grid; hydro-adjacent.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Free-air / chilled water. Mountain climate favors economization.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Covilhã, Castelo Branco, Portugal

Covilhã, Portugal

40.281°, -7.504° · Europe

Tenants / users

Enterprise, public sector

Notes

7 MW live interior-Portugal colo. One of the larger non-Lisbon operating sites before Sines.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.