Ascenty Rio de Janeiro
Ascenty (Digital Realty) · Rio de Janeiro
- IT live
- 10 MW
- Free to lease
- 1.6 MW
- $ / kW·mo
- $97
- White space
- 122k ft²
Inventory
84% occupiedPower
10 MWlive
1.6 MW to lease · 8.4 MW in use
White space
122k ft²total
11k ft² free · 110k ft² occupied
11k m² · 1,032 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 7.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 10 MW
- $12M/yr
- 8 kW rack
- $777/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.1M/yr less.
Light · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 80%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Light SESA. Dual feeds plus on-site diesel. Rio concession.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rio de Janeiro, Rio de Janeiro, Brazil
Rio de Janeiro, Brazil
-22.907°, -43.173° · South America
Tenants / users
Cloud, enterprise, subsea
Notes
Ascenty Rio hall. Complements Digital Realty GIG1 and Equinix RJ1-RJ3. Light concession.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.