Operational
Colocation
Liquid cooling
Tier III

Ascenty Queretaro 3

Ascenty (Digital Realty) · Queretaro

IT live
25 MW
Free to lease
3 MW
$ / kW·mo
$92
White space
140k ft²

Inventory

88% occupied

Power

25 MWlive

3 MW to lease · 22 MW in use

White space

140k ft²total

13k ft² free · 126k ft² occupied

13k m² · 1,244 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live25 MW
Free to lease3 MW
Utility feed31.3 MW
Campus / planned25 MW

About 6.3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 25 MW
$27M/yr
18 kW rack
$1,648/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $19M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2024
Renewable match
30%
Rack density
18 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

18 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Colon, Queretaro, Mexico

VESTA Queretaro, Colon

20.786°, -100.052° · North America

Tenants / users

Hyperscale, cloud

Notes

Third Ascenty Queretaro hall. Campus ~81 MW across three buildings.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.