Ascenty Queretaro 1
Ascenty (Digital Realty) · Queretaro
- IT live
- 21 MW
- Free to lease
- 2.5 MW
- $ / kW·mo
- $92
- White space
- 140k ft²
Inventory
88% occupiedPower
21 MWlive
2.5 MW to lease · 18.5 MW in use
White space
140k ft²total
11k ft² free · 128k ft² occupied
13k m² · 1,045 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 10.3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$92/kW·mo
9.8¢ industrial · 12.5¢ after PUE 1.28
- Per MW·year
- $1.1M
- This site · 21 MW
- $23M/yr
- 18 kW rack
- $1,648/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2022
- Renewable match
- 30%
- Rack density
- 18 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
18 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Colon, Queretaro, Mexico
VESTA Queretaro, Camino a Nativitas 800, Colon
20.782°, -100.048° · North America
Tenants / users
Hyperscale, cloud, Digital Realty interconnection
Notes
First Ascenty Mexico hall. 21 MW. Digital Realty / Brookfield. Complements DLR QRO1 already in the index.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.