Operational
Colocation
Liquid cooling
Tier III

Ascenty Hortolândia 6

Ascenty (Digital Realty) · Hortolândia

IT live
30 MW
Free to lease
4.8 MW
$ / kW·mo
$92
White space
188k ft²

Inventory

84% occupied

Power

30 MWlive

4.8 MW to lease · 25.2 MW in use

White space

188k ft²total

24k ft² free · 164k ft² occupied

17k m² · 2,230 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live30 MW
Free to lease4.8 MW
Utility feed37.5 MW
Campus / planned30 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 30 MW
$33M/yr
15 kW rack
$1,374/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.

CPFL Campinas · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
80%
Rack density
15 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CPFL Campinas. Dual feeds plus on-site diesel. Interior São Paulo industrial corridor.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hortolândia, São Paulo, Brazil

Hortolândia, Campinas metro, São Paulo

-22.861°, -47.224° · South America

Tenants / users

Hyperscale, cloud, AI colo

Notes

Sixth Hortolândia building. 30 MW, 23,000 m2. Completes the interior-SP Ascenty cluster with Vinhedo and Campinas.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.