Operational
Colocation
Air cooled
Tier III

Ascenty Hortolândia 2

Ascenty (Digital Realty) · Hortolândia

IT live
7 MW
Free to lease
1.1 MW
$ / kW·mo
$92
White space
61k ft²

Inventory

84% occupied

Power

7 MWlive

1.1 MW to lease · 5.9 MW in use

White space

61k ft²total

7,778 ft² free · 53k ft² occupied

5,677 m² · 723 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live7 MW
Free to lease1.1 MW
Utility feed8.8 MW
Campus / planned7 MW

About 1.8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$92/kW·mo

9.8¢ industrial · 12.5¢ after PUE 1.28

Per MW·year
$1.1M
This site · 7 MW
$7.7M/yr
8 kW rack
$733/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.2M/yr less.

CPFL Campinas · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
80%
Rack density
8 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
CPFL Campinas. Dual feeds plus on-site diesel. Interior São Paulo industrial corridor.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hortolândia, São Paulo, Brazil

Hortolândia, Campinas metro, São Paulo

-22.859°, -47.221° · South America

Tenants / users

Cloud, enterprise

Notes

7 MW, 3,000 m2, 650 racks. N+1 chilled water, Rapid Restore. Pair to Hortolândia 1 and 3.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.