Expanding
Colocation
Air cooled
Tier III

Ascenty Brasília

Ascenty (Digital Realty) · Brasília

IT live
8 MW
Free to lease
1.3 MW
$ / kW·mo
$88
White space
104k ft²

Inventory

84% occupied

Power

8 MWlive

1.3 MW to lease · 6.7 MW in use

White space

104k ft²total

8,889 ft² free · 95k ft² occupied

9,677 m² · 826 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease1.3 MW
Utility feed15 MW
Campus / planned12 MW

About 7 MW of the utility feed is cooling, conversion, and house load.

Power cost

$88/kW·mo

9.4¢ industrial · 12¢ after PUE 1.28

Per MW·year
$1.1M
This site · 8 MW
$8.4M/yr
8 kW rack
$703/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.6M/yr less.

Neoenergia DF · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
80%
Rack density
8 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Neoenergia / CEB. Dual feeds. Brasília federal grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Brasília, Distrito Federal, Brazil

Brasília, Distrito Federal

-15.794°, -47.882° · South America

Tenants / users

Government, enterprise, cloud

Notes

Federal-capital Ascenty hall. Government and LatAm DR. Dual-site with São Paulo for north-south diversity.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.