Aruba IT4 Rome Hyper Cloud
Aruba · Tecnopolo Tiburtino

- IT live
- 6 MW
- Free to lease
- 0.6 MW
- $ / kW·mo
- $172
- White space
- 213k ft²
Inventory
90% occupiedPower
6 MWlive
0.6 MW to lease · 5.4 MW in use
White space
213k ft²total
3,409 ft² free · 210k ft² occupied
20k m² · 317 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 31.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$172/kW·mo
18.4¢ industrial · 23.6¢ after PUE 1.28
- Per MW·year
- $2.1M
- This site · 6 MW
- $12M/yr
- 12 kW rack
- $2,063/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $10M/yr less.
Italy industrial / Rome · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2025
- Renewable match
- 85%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rome, Lazio, Italy
Tecnopolo Tiburtino, Rome
41.918°, 12.574° · Europe
Tenants / users
Aruba Cloud, government, enterprise, south-Italy DR
Notes
Largest Rome campus. 74,000 sqm, five halls x 6 MW toward 30 MW. First Rating-4 ANSI/TIA-942-C hall in south-central Italy. Dual-site with Arezzo and Bergamo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.