Aruba IT3 Ponte San Pietro
Aruba · Global Cloud Data Center

- IT live
- 21 MW
- Free to lease
- 2.1 MW
- $ / kW·mo
- $174
- White space
- 341k ft²
Inventory
90% occupiedPower
21 MWlive
2.1 MW to lease · 18.9 MW in use
White space
341k ft²total
12k ft² free · 329k ft² occupied
32k m² · 1,109 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 39 MW of the utility feed is cooling, conversion, and house load.
Power cost
$174/kW·mo
18.6¢ industrial · 23.8¢ after PUE 1.28
- Per MW·year
- $2.1M
- This site · 21 MW
- $44M/yr
- 12 kW rack
- $2,086/mo
5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $36M/yr less.
Italy industrial / Milan · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2017
- Renewable match
- 90%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Groundwater closed-loop plus CRAH. Rating 4 ANSI/TIA-942. High-density liquid cabinets on newer halls.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ponte San Pietro, Lombardy, Italy
Via San Clemente 53, 24036 Ponte San Pietro BG
45.698°, 9.584° · Europe
Tenants / users
Aruba Cloud, Azure Local, enterprise, MIX-adjacent
Notes
200,000 sqm Bergamo campus, 45 MW IT / 60 MW site. Groundwater cooling. Azure Local on-net. Largest live Italian operator campus after DATA4 Cornaredo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.