Operational
Colocation
Air cooled
Tier IV

Aruba IT1 Arezzo

Aruba · Arezzo

Aruba IT1 Arezzo facility
Aruba · Source
IT live
2 MW
Free to lease
0.2 MW
$ / kW·mo
$166
White space
39k ft²

Inventory

90% occupied

Power

2 MWlive

0.2 MW to lease · 1.8 MW in use

White space

39k ft²total

1,562 ft² free · 38k ft² occupied

3,629 m² · 145 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live2 MW
Free to lease0.2 MW
Utility feed5 MW
Campus / planned4 MW

About 3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$166/kW·mo

17.8¢ industrial · 22.8¢ after PUE 1.28

Per MW·year
$2M
This site · 2 MW
$4M/yr
6 kW rack
$998/mo
3.2¢ cheapdear 22.4¢

5.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.3M/yr less.

Italy industrial / Tuscany · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2011
Renewable match
80%
Rack density
6 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Arezzo, Tuscany, Italy

Via Piero Gobetti 96, 52100 Arezzo

43.463°, 11.879° · Europe

Tenants / users

Aruba Cloud, enterprise, government

Notes

Original Aruba Rating-4 hall. Dual-site with IT2 on the same Arezzo campus. Sovereign Italian cloud, not a hyperscale factory.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.