Ark Meridian Park
Ark Data Centres · Meridian Park
- IT live
- 16 MW
- Free to lease
- 1.6 MW
- $ / kW·mo
- $164
- White space
- 80k ft²
Inventory
90% occupiedPower
16 MWlive
1.6 MW to lease · 14.4 MW in use
White space
80k ft²total
8,000 ft² free · 72k ft² occupied
7,432 m² · 743 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 19 MW of the utility feed is cooling, conversion, and house load.
Power cost
$164/kW·mo
18.4¢ industrial · 22.4¢ after PUE 1.22
- Per MW·year
- $2M
- This site · 16 MW
- $31M/yr
- 15 kW rack
- $2,458/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.
England industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2019
- Renewable match
- 80%
- Rack density
- 15 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- UK Power Networks plus operator renewable PPAs. Dual utility feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Enfield, England, United Kingdom
Meridian Park, Enfield
51.660°, -0.070° · Europe
Tenants / users
Cloud, enterprise, government
Notes
North London Ark campus near VIRTUS LONDON1.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.