Apple Viborg Foulum
Apple · Foulum

- IT live
- 80 MW
- Remaining
- 40 MW
- $ / kW·mo
- $92
- White space
- 750k ft²
Inventory
67% occupiedPower
120 MWcampus
40 MW to commission · 80 MW in use
White space
1.1M ft²total
375k ft² free · 750k ft² occupied
105k m² · 35k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 70 MW of the utility feed is cooling, conversion, and house load.
Power cost
$92/kW·mo
11.2¢ industrial · 12.5¢ after PUE 1.12
- Per MW·year
- $1.1M
- This site · 80 MW
- $88M/yr
- 15 kW rack
- $1,374/mo
3.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $63M/yr less.
Denmark DK1 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 100%
- Rack density
- 15 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Energinet. Dual feeds. Wind-heavy Danish grid plus Viking Link.
Cooling
Plant
Free air
Liquid
Not deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Air-cooled with district-heat recovery into Viborg fjernvarme. No chip-level liquid loop disclosed.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Viborg, Central Jutland, Denmark
Hobro Landevej 8, 8830 Tjele
56.492°, 9.575° · Europe
Tenants / users
Apple
Notes
Apple's only operating European data center. 166,000 sqm campus. ~700 GWh/year class load. District heating promised; delivery has lagged municipal hopes.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.