Apple Prineville
Apple
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $49
- White space
- —
Power
Power cost
$49/kW·mo
5.2¢ industrial · 6.8¢ after PUE —
- Per MW·year
- $592k
- This site
- —
1.6× the cheapest market (Iceland Landsvirkjun).
BPA Central Oregon · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- 100%
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- 56% wind, 43% solar, 1% micro-hydro (Apple report, via DCD).
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Prineville, Oregon, United States
1600 Baldwin Road, Prineville, OR 97754
44.303°, -120.846° · North America
Tenants / users
Apple
Notes
Apple-owned data center, one of eight Apple says are certified to the Alliance for Water Stewardship standard (Apple 2026 Environmental Progress Report). Used 255 million kWh in 2024 (Apple, via DCD). Address from the site's water stewardship certification report. Capacity not published. Coordinates: OSM relation 186812 (town center, approximate). Sources: https://a4ws.org/wp-content/uploads/2024/01/Apple-Prineville-Certification-Report-2024-01-15.pdf ; https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf ; https://www.datacenterdynamics.com/en/news/apple-data-centers-consumed-more-than-25-billion-kwh-over-2024/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.