Apple Maiden
Apple · Maiden
- IT live
- 100 MW
- Remaining
- 60 MW
- $ / kW·mo
- $63
- White space
- 568k ft²
Inventory
63% occupiedPower
160 MWcampus
60 MW to commission · 100 MW in use
White space
909k ft²total
341k ft² free · 568k ft² occupied
84k m² · 32k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 60 MW of the utility feed is cooling, conversion, and house load.
Power cost
$63/kW·mo
7.7¢ industrial · 8.6¢ after PUE 1.12
- Per MW·year
- $755k
- This site · 100 MW
- $76M/yr
- 12 kW rack
- $755/mo
2.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $44M/yr less.
Duke Energy · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2010
- Renewable match
- 100%
- Rack density
- 12 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Duke Energy plus on-site 100+ MW solar and Bloom fuel cells.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Evaporative cooling. One of the first 100% renewable hyperscale campuses.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Maiden, North Carolina, United States
Maiden, Catawba County, NC
35.576°, -81.212° · North America
Tenants / users
Apple iCloud
Notes
Apple's first large custom data center. On-site solar and fuel cells.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.