Operational
Hyperscale
Air cooled
Tier III

Apple Maiden

Apple · Maiden

IT live
100 MW
Remaining
60 MW
$ / kW·mo
$63
White space
568k ft²

Inventory

63% occupied

Power

160 MWcampus

60 MW to commission · 100 MW in use

White space

909k ft²total

341k ft² free · 568k ft² occupied

84k m² · 32k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live100 MW
Remaining60 MW
Utility feed160 MW
Campus / planned160 MW

About 60 MW of the utility feed is cooling, conversion, and house load.

Power cost

$63/kW·mo

7.7¢ industrial · 8.6¢ after PUE 1.12

Per MW·year
$755k
This site · 100 MW
$76M/yr
12 kW rack
$755/mo
3.2¢ cheapdear 22.4¢

2.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $44M/yr less.

Duke Energy · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2010
Renewable match
100%
Rack density
12 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Duke Energy plus on-site 100+ MW solar and Bloom fuel cells.

Cooling

Plant

Evaporative

Liquid

Not deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Evaporative cooling. One of the first 100% renewable hyperscale campuses.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Maiden, North Carolina, United States

Maiden, Catawba County, NC

35.576°, -81.212° · North America

Tenants / users

Apple iCloud

Notes

Apple's first large custom data center. On-site solar and fuel cells.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.