Allied 150 West Georgia

Allied Properties / Westbank · Beatty / Georgia

Allied 150 West Georgia facility
Wikimedia Commons · Source
Planned IT
39 MW
Free to lease
39 MW
$ / kW·mo
$60
White space
98k ft²

Inventory

0% occupied

Power

39 MWlive

39 MW to lease · 0 MW in use

White space

98k ft²total

98k ft² free · — occupied

9,058 m² · 9,058 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease39 MW
Utility feed—
Campus / planned39 MW

Power cost

$60/kW·mo

6.8¢ industrial · 8.2¢ after PUE 1.20

Per MW·year
$715k
This site · 39 MW
$28M/yr
40 kW rack
$2,383/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

BC Hydro · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
96%
Rack density
40 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
BC Hydro Murrin-to-Beatty underground transmission. 39 MW committed, path to 50 MW, potential 100 MW.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

AI-ready liquid. Waste-heat reuse into Creative Energy district steam — designed as a net-positive heat source for downtown Vancouver.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Vancouver, British Columbia, Canada

150 West Georgia Street (720 Beatty), Vancouver, BC

49.279°, -123.114° · North America

Tenants / users

TELUS sovereign AI (announced offtake), Canadian operator (sale of majority stake contemplated)

Notes

10-story AI hall on the former 720 Beatty / Creative Energy plant site. Allied + Westbank. TELUS is taking capacity as part of the BC sovereign AI cluster (online 2029). Not a Harbour Centre cage.