Aligned SLC West Jordan
Aligned Data Centers · SLC-02/03/04

- IT live
- 48 MW
- Free to lease
- 5.8 MW
- $ / kW·mo
- $57
- White space
- 414k ft²
Inventory
88% occupiedPower
48 MWlive
5.8 MW to lease · 42.2 MW in use
White space
414k ft²total
21k ft² free · 392k ft² occupied
38k m² · 1,967 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 64.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$57/kW·mo
6.8¢ industrial · 7.8¢ after PUE 1.15
- Per MW·year
- $685k
- This site · 48 MW
- $33M/yr
- 24 kW rack
- $1,370/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $17M/yr less.
Rocky Mountain Power · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2021
- Renewable match
- 50%
- Rack density
- 24 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Rocky Mountain Power. Dual feeds. Wasatch Front.
Cooling
Plant
Evaporative
Liquid
Deployed
Rack density
24 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Aligned DeltaFlow near-zero-water cooling plus liquid-ready manifolds for AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
West Jordan, Utah, United States
3333 W 9000 S, West Jordan, UT
40.610°, -111.939° · North America
Tenants / users
Hyperscale, cloud, enterprise
Notes
Wasatch Aligned campus. Pair to DataBank SLC1. Cheap mountain-west power vs Northern Virginia.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.