Under construction
Colocation
Liquid cooling
Tier III

Aligned PDX-01 Hillsboro

Aligned Data Centers · PDX-01

Planned IT
72 MW
Free to lease
72 MW
$ / kW·mo
$47
White space
225k ft²

Inventory

0% occupied

Power

72 MWlive

72 MW to lease · 0 MW in use

White space

225k ft²total

225k ft² free · — occupied

21k m² · 21k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease72 MW
Utility feed—
Campus / planned72 MW

Power cost

$47/kW·mo

5.2¢ industrial · 6.5¢ after PUE 1.25

Per MW·year
$569k
This site · 72 MW
$41M/yr
30 kW rack
$1,424/mo
3.2¢ cheapdear 22.4¢

1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.

PGE / BPA · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2026
Renewable match
80%
Rack density
30 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
Portland General Electric / BPA. Dual feeds. Hydro-backed Northwest grid.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

30 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Aligned DeltaFlow near-zero-water cooling plus liquid-ready manifolds for AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hillsboro, Oregon, United States

Hillsboro, OR

45.534°, -122.929° · North America

Tenants / users

Hyperscale

Notes

Northwest Aligned campus. Complements QTS Hillsboro and STACK Portland already in the index. BPA-cheap power.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.