Expanding
Colocation
Liquid cooling
Tier III

Aligned ORD Northlake

Aligned Data Centers · ORD-01/02

IT live
72 MW
Free to lease
8.6 MW
$ / kW·mo
$68
White space
404k ft²

Inventory

88% occupied

Power

72 MWlive

8.6 MW to lease · 63.4 MW in use

White space

404k ft²total

32k ft² free · 373k ft² occupied

38k m² · 2,951 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live72 MW
Free to lease8.6 MW
Utility feed110 MW
Campus / planned88 MW

About 38 MW of the utility feed is cooling, conversion, and house load.

Power cost

$68/kW·mo

8.1¢ industrial · 9.3¢ after PUE 1.15

Per MW·year
$816k
This site · 72 MW
$59M/yr
24 kW rack
$1,632/mo
3.2¢ cheapdear 22.4¢

2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $36M/yr less.

ComEd · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2020
Renewable match
40%
Rack density
24 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
ComEd / PJM. Dual 34.5 kV inlets plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

24 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Aligned DeltaFlow near-zero-water cooling plus liquid-ready manifolds for AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Northlake, Illinois, United States

505 Northwest Avenue, Northlake, IL

41.920°, -87.895° · North America

Tenants / users

Hyperscale, cloud

Notes

18.5-acre Chicago campus. ORD-01 36 MW, ORD-02 expandable to 52 MW. Complements CyrusOne Aurora and STACK Elk Grove.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.