Aligned ORD Northlake
Aligned Data Centers · ORD-01/02
- IT live
- 72 MW
- Free to lease
- 8.6 MW
- $ / kW·mo
- $68
- White space
- 404k ft²
Inventory
88% occupiedPower
72 MWlive
8.6 MW to lease · 63.4 MW in use
White space
404k ft²total
32k ft² free · 373k ft² occupied
38k m² · 2,951 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 38 MW of the utility feed is cooling, conversion, and house load.
Power cost
$68/kW·mo
8.1¢ industrial · 9.3¢ after PUE 1.15
- Per MW·year
- $816k
- This site · 72 MW
- $59M/yr
- 24 kW rack
- $1,632/mo
2.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $36M/yr less.
ComEd · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2020
- Renewable match
- 40%
- Rack density
- 24 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- ComEd / PJM. Dual 34.5 kV inlets plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
24 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Aligned DeltaFlow near-zero-water cooling plus liquid-ready manifolds for AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Northlake, Illinois, United States
505 Northwest Avenue, Northlake, IL
41.920°, -87.895° · North America
Tenants / users
Hyperscale, cloud
Notes
18.5-acre Chicago campus. ORD-01 36 MW, ORD-02 expandable to 52 MW. Complements CyrusOne Aurora and STACK Elk Grove.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.