Expanding
Colocation
Liquid cooling
Tier III

Aligned IAD Ashburn

Aligned Data Centers · IAD-01/02/03

IT live
108 MW
Free to lease
13.0 MW
$ / kW·mo
$61
White space
740k ft²

Inventory

88% occupied

Power

108 MWlive

13.0 MW to lease · 95.0 MW in use

White space

740k ft²total

43k ft² free · 698k ft² occupied

69k m² · 3,961 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live108 MW
Free to lease13.0 MW
Utility feed225 MW
Campus / planned180 MW

About 117 MW of the utility feed is cooling, conversion, and house load.

Power cost

$61/kW·mo

7.3¢ industrial · 8.4¢ after PUE 1.15

Per MW·year
$735k
This site · 108 MW
$79M/yr
28 kW rack
$1,716/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $45M/yr less.

Northern Virginia / Dominion · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2019
Renewable match
50%
Rack density
28 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Dominion Energy. Dual 34.5 kV inlets plus on-site diesel. Northern Virginia PJM.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

28 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Aligned DeltaFlow near-zero-water cooling plus liquid-ready manifolds for AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ashburn, Virginia, United States

Ashburn, VA

39.049°, -77.491° · North America

Tenants / users

Hyperscale, cloud, AI

Notes

26-acre Ashburn campus. Dual 230 kV Dominion substations at full build. Prefab power train; first 12 MW commissioned in under six months.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.