Aligned IAD Ashburn
Aligned Data Centers · IAD-01/02/03
- IT live
- 108 MW
- Free to lease
- 13.0 MW
- $ / kW·mo
- $61
- White space
- 740k ft²
Inventory
88% occupiedPower
108 MWlive
13.0 MW to lease · 95.0 MW in use
White space
740k ft²total
43k ft² free · 698k ft² occupied
69k m² · 3,961 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 117 MW of the utility feed is cooling, conversion, and house load.
Power cost
$61/kW·mo
7.3¢ industrial · 8.4¢ after PUE 1.15
- Per MW·year
- $735k
- This site · 108 MW
- $79M/yr
- 28 kW rack
- $1,716/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $45M/yr less.
Northern Virginia / Dominion · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2019
- Renewable match
- 50%
- Rack density
- 28 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Dominion Energy. Dual 34.5 kV inlets plus on-site diesel. Northern Virginia PJM.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
28 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Aligned DeltaFlow near-zero-water cooling plus liquid-ready manifolds for AI cabinets.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ashburn, Virginia, United States
Ashburn, VA
39.049°, -77.491° · North America
Tenants / users
Hyperscale, cloud, AI
Notes
26-acre Ashburn campus. Dual 230 kV Dominion substations at full build. Prefab power train; first 12 MW commissioned in under six months.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.