Operational
Hyperscale
Liquid cooling
Tier III

Alibaba Cloud Mexico

Alibaba Cloud · Mexico

IT live
12 MW
Remaining
12 MW
$ / kW·mo
$89
White space
134k ft²

Inventory

50% occupied

Power

24 MWcampus

12 MW to commission · 12 MW in use

White space

268k ft²total

134k ft² free · 134k ft² occupied

25k m² · 12k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live12 MW
Remaining12 MW
Utility feed30 MW
Campus / planned24 MW

About 18 MW of the utility feed is cooling, conversion, and house load.

Power cost

$89/kW·mo

9.8¢ industrial · 12.3¢ after PUE 1.25

Per MW·year
$1.1M
This site · 12 MW
$13M/yr
18 kW rack
$1,610/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.7M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2025
Renewable match
30%
Rack density
18 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

18 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.586°, -100.381° · North America

Tenants / users

Alibaba Cloud

Notes

Alibaba Cloud first Mexico region, launched Feb 2025. Queretaro. Fourth hyperscaler in the Bajio after Azure, AWS, and Google.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.